Modern Engineering & Projects Intrinsic Value

Modern Engineering & Projects (MEAPL) median intrinsic value is ₹43.33 from 2 valuation models (range ₹31–₹43), vs current price ₹29.71 — +45.8% upside (Trading Below Calculated Value), margin of safety 31.4%. Analyse Modern Engineering & Projects ownership pattern to track promoter, FII and institutional holdings.

Current Stock Price
₹29.71
Primary Intrinsic Value
₹43.33
Market Cap
₹44.6 Cr
+45.8% Upside
Median Value
₹43.33
Value Range
₹31 - ₹43
Assessment
Trading Below Calculated Value
Safety Margin
31.4%

MEAPL Valuation Methods Summary — DCF, Graham Number & P/E

Modern Engineering & Projects intrinsic value across 2 models vs current price ₹29.71 — upside/downside and value range per method. For current market price and key ratios, visit Modern Engineering & Projects share price chart.

Method Type Intrinsic Value Range Upside/Downside Details
Book Value Method asset ₹43.33 ₹39.00 - ₹47.66 +45.8% Book Value/Share: ₹43.33, P/B: 1.0x
Simple DCF (5Y) dcf ₹30.95 ₹24.76 - ₹37.14 +4.2% CF Growth: 5.0%, Discount: 15%
Method Types: Earnings Asset DCF Growth Dividend Conservative

MEAPL Intrinsic Value vs Market Price — All Valuation Models

Modern Engineering & Projects fair value range ₹31–₹43 vs current market price ₹29.71 across 2 valuation models. Read MEAPL ex-dividend dates for the complete payout history and dividend yield track record.

MEAPL Intrinsic Value Analysis — Undervalued or Overvalued?

Modern Engineering & Projects median intrinsic value ₹43.33, current price ₹29.71 — Trading Below Calculated Value by 45.8%, margin of safety 31.4%.

What is the intrinsic value of MEAPL?

Based on our comprehensive analysis using 2 different valuation methods, the estimated intrinsic value of Modern Engineering & Projects (MEAPL) is ₹43.33 (median value). With the current market price of ₹29.71, this represents a +45.8% variance from our estimated fair value.

The valuation range spans from ₹30.95 to ₹43.33, indicating ₹30.95 - ₹43.33.

Is MEAPL undervalued or overvalued?

Based on our multi-method analysis, Modern Engineering & Projects (MEAPL) appears to be trading below calculated value by approximately 45.8%.

MEAPL Financial Health — Key Ratios vs Industry Benchmarks

Modern Engineering & Projects financial ratios — ROE, debt-to-equity, profit margins and liquidity vs industry benchmarks and their impact on intrinsic value.

Financial Metric Current Value Industry Benchmark Assessment Impact on Valuation
Current Ratio 4.37 Industry Standard: 2.0+ Above 2.0 Measures short-term liquidity capacity
Operating Margin -100.0% Industry Standard: 20%+ Below 10% Indicates operational efficiency level

MEAPL Cash Flow Quality — Operating & Free Cash Flow

Modern Engineering & Projects operating cash flow, free cash flow, quality rating and sustainability score by period — key inputs to DCF intrinsic value calculation.

Period Operating Cash Flow Free Cash Flow Cash Flow Quality Sustainability Score
March 2025 ₹-27 Cr ₹-36 Cr Negative Cash Flow 3/10
March 2024 ₹5 Cr ₹2 Cr Positive Free Cash Flow 7/10
March 2023 ₹15 Cr ₹9 Cr Positive Free Cash Flow 8/10
March 2022 ₹-3 Cr ₹-5 Cr Negative Cash Flow 3/10
March 2021 ₹0 Cr ₹0 Cr Negative Cash Flow 3/10